Phase 1 2007-2008

Robert St. Curb Poor

Chase Loring Eddition road curbs are being poured.

Woodland Ave. Side Phase 1

Rock and Floodwall compleated on phase 1

W. Robert St. Side of Phase 1

Compleated phase one flood wall, Robert St.

Overlook of dam and phase 1 flood wall

Over looking Red Lake River and compleated phase 1.

W. Robert St. and flood wall compleated

Another Picture depicting the floodwall, no rock.

Woodland phase 1 compleate

Flood Wall and rock.

Close up of floodwall

Painted precast floodwall.

Woodland bridge phase 1 complete

rock and floodwall

Dam and floodwall

Dam rapids tied into floodwall.

Item 10 Title

Item 10 Description

Item 11 Title

Item 11 Description

Item 12 Title

Item 12 Description

Retaining wall near completion on Robert Ct.

Phase 1 retaining wall on Robert Ct.

Phase 2 2008-2009

Start of Phase 2

Overlooking Oak Court.

Floodwall Footings

Under Construction.

More Footings

Phase 2 footings.

Trenching For a new sewer line

Using an elaborate system to keep the river water out of the trench.