Chase Loring Eddition road curbs are being poured.
Rock and Floodwall compleated on phase 1
Compleated phase one flood wall, Robert St.
Over looking Red Lake River and compleated phase 1.
Another Picture depicting the floodwall, no rock.
Flood Wall and rock.
Painted precast floodwall.
rock and floodwall
Dam rapids tied into floodwall.
Item 10 Description
Item 11 Description
Item 12 Description
Phase 1 retaining wall on Robert Ct.
Overlooking Oak Court.
Under Construction.
Phase 2 footings.
Using an elaborate system to keep the river water out of the trench.
Item 5 Description
Item 6 Description
Item 7 Description
Search Our Site